Case Studies

As of 2014, Alexander Project Services will have been instrumental in the completion of projects totaling 579 MW of commercial renewable energy. Below are four success stories that showcase our team’s roles.

Combine Hills Turbine Ranch

Combine Hills Turbine Ranch

Umatilla County, Oregon

OWNER: Eurus Energy America Corporation
SIZE: 104 MW wind energy
COMPLETED: 2010
OUR ROLE:
  • Development
  • Permitting
  • Owner’s representative for compliance
  • Asset support
Eurus Energy
Bull Creek Wind Farm

Bull Creek Wind Farm

Borden County, Texas

OWNER: Eurus Energy America Corporation
SIZE: 180 MW wind energy
COMPLETED: 2008
OUR ROLE:
  • Development
  • Permitting
  • Owner’s representative for compliance
Eurus Energy
Avenal Solar Projects

Avenal Solar Projects

Avenal, California

OWNER: Eurus Energy America Corp. and NRG Energy
SIZE: 45 MW solar energy
COMPLETED: 2011
OUR ROLE:
  • Development support
  • Construction owner’s representative

“On site, Bill Alexander is a leader, mentor and motivator with the ability to integrate the divergent interests of companies and individuals into a cohesive and productive project team.”— David Novick, EPC Projects Manager, NRG Energy
California Valley Solar Ranch

California Valley Solar Ranch

San Luis Obispo County, California

OWNER: NRG Energy
SIZE: 250 MW solar energy
COMPLETED: 2013
OUR ROLE:
  • Construction owner’s representative
nrg SUNPOWER

“Simply put, Bill Alexander exceeded SunPower’s expectations and was instrumental in making California Valley Solar Ranch successful. Bill’s ability to foster relationships and improve execution differentiates him within the renewable arena.”— Rob Vinje, VP of EPC for SunPower Corporation